The Dells at Cathedral Point
Project Address
Prescott, AZ
Conditioned Square Footage
2,207 sqft
Number of Bedrooms
3 Beds
Number of Bathrooms
3.0 Baths
Number of Floors Above Grade
1 Floor Above Grade
Home Type
Production
Climate Zone Temperature
Mixed
Climate Zone Humidity
Dry
With PV
HERS Index with PV
-2HERS (PV)
Average Monthly Energy Bill PV
$-19Average Monthly Energy Bill (PV)
Annual Energy Cost Savings with PV
$2,300Annual Energy Cost Savings (PV)
30 Year Savings with PV
$121,00030 Year Savings (PV)
Learn More
Key Features
Key Features
Energy / Heat recovery ventilator High-performance wall with continuous insulation Raised-heel trusses Unvented insulated attic ACH 50 < 2.5 or CFM50/SF of enclosure ≤ 0.25 Central Manifold Plumbing Design
Read the Case Study
See the Poster
Testimonials
Home owner (or occupant) TestimonyThe greatest reward would have to be pride in what we have chosen to do. We transitioned to 100% DOE ZERH in 2013. We will start between 120 and 150 new homes in 2016. Everything we build will be a DOE ZERH-compliant home. Anyone not moving toward this program is behind the curve.Testimony CitationGeoff Ferrell, manager of construction and energy efficiency, Mandalay Homes